Client K, Kawaguchi: two-story timber house, after demolition
Client K, Kawaguchi: two-story timber house, before demolition

CASE 01

Client K, Kawaguchi: two-story timber house

Structure
Timber
Floor area
32 tsubo
Duration
12 days
Cost (tax incl.)
¥1,580,000

32 tsubo (approx. 106 m²). With just 80 cm between neighboring houses, we enclosed the site in scaffolding and mesh sheeting before sorting materials by hand. Completed in 12 days for ¥1,580,000 (tax incl.; no additional work).

Client T, Saitama: steel warehouse, after demolition
Client T, Saitama: steel warehouse, before demolition

CASE 02

Client T, Saitama: steel warehouse

Structure
Steel
Floor area
60 tsubo
Duration
18 days
Cost (tax incl.)
¥3,100,000

A single-story warehouse of 60 tsubo (approx. 198 m²). We surveyed the fiber-cement roof and confirmed it contained no asbestos before demolition. All structural steel was recovered as saleable scrap. Completed in 18 days for ¥3,100,000 (tax incl.).

Client S, Adachi: timber house on a narrow site, after demolition
Client S, Adachi: timber house on a narrow site, before demolition

CASE 03

Client S, Adachi: timber house on a narrow site

Structure
Timber
Floor area
18 tsubo
Duration
14 days
Cost (tax incl.)
¥1,280,000

18 tsubo (approx. 60 m²), with a 2.7 m access road. As 4-tonne trucks could not enter, we combined 2-tonne vehicles with hand demolition. Completed in 14 days for ¥1,280,000 (tax incl.).

Client M, Toda: three-story reinforced-concrete office, after demolition
Client M, Toda: three-story reinforced-concrete office, before demolition

CASE 04

Client M, Toda: three-story reinforced-concrete office

Structure
Reinforced concrete
Floor area
85 tsubo
Duration
35 days
Cost (tax incl.)
¥7,200,000

85 tsubo (approx. 281 m²). Asbestos was found in sprayed material above the ceiling. We isolated and removed it before demolishing the building. Completed in 35 days for ¥7,200,000 (tax incl., including asbestos removal).

Client Y, Koshigaya: shop interior, after strip-out
Client Y, Koshigaya: shop interior, before strip-out

CASE 05

Client Y, Koshigaya: shop interior strip-out

Structure
Interior strip-out
Floor area
40 tsubo
Duration
6 days
Cost (tax incl.)
¥960,000

Handover of a restaurant of 40 tsubo (approx. 132 m²). We removed kitchen equipment and floor tiles, returning it to a bare shell. Completed in six days for ¥960,000 (tax incl.).

Client H, Soka: vacant house and block wall, after demolition
Client H, Soka: vacant house and block wall, before demolition

CASE 06

Client H, Soka: vacant house and block wall

Structure
Timber
Floor area
28 tsubo
Duration
10 days
Cost (tax incl.)
¥1,520,000

A vacant timber house of 28 tsubo (approx. 93 m²), a 12 m block wall and garden trees. We helped with the city’s vacant-house demolition subsidy application. Completed in 10 days for ¥1,520,000 (tax incl., including additional work).