解体キングKAITAI KING

KAITAI KINGDemolition and site tools

Break. Cut. Make way. We are a demolition company in Kawaguchi, Saitama, selling tools we have tested and selected on our own sites.

Break. Cut. Make way.

DEMOLITIONPlan a demolitionTimber, steel and reinforced-concrete buildings, or interior strip-outs. Select the floor area and structure for an instant cost range.Demolition servicesSHOPBuy tools36 products: blades, discs, chisels, rubble bags and dust protection. Orders placed by 2 pm on weekdays ship the same day.Visit the shop

DEMOLITION

Buildings and interiors
Our crew. Our machines.

Timber, steel and reinforced-concrete houses, apartments, shops, warehouses and offices. We strip out fittings and interiors by hand, demolish with machinery, remove the foundations and level the site.

Instant cost range

Building structure

tsubo

Enter a whole number from 5 to 300 tsubo. One tsubo is approximately 3.3 m².

ESTIMATE

Estimated cost (tax incl.)

1,080,000–1,440,000JPY

Calculate in detail
Client K, Kawaguchi: two-story timber house, after demolition
Client K, Kawaguchi: two-story timber house, before demolition

WORKS

Client K, Kawaguchi: two-story timber house

Structure
Timber
Floor area
32 tsubo
Duration
12 days
Cost (tax incl.)
¥1,580,000

32 tsubo (approx. 106 m²). With just 80 cm between neighboring houses, we enclosed the site in scaffolding and mesh sheeting before sorting materials by hand. Completed in 12 days for ¥1,580,000 (tax incl.; no additional work).

View all projects

FLOW

Nine steps
To a clear site

01 / 09

Explore our process
  1. 01

    Contact

    Call or use our form. You can carry your choices over from the cost calculator.

  2. 02

    Site survey

    Free of charge. In about an hour, we check the building, road access, distances to neighboring properties and any contents left inside.

  3. 03

    Pre-demolition asbestos survey

    A qualified surveyor reviews drawings and inspects the site, with laboratory testing where needed. Findings are reported as required by law.

  4. 04

    Estimate and contract

    We provide an itemized estimate within two business days of the survey.

  5. 05

    Notifications and neighbor visits

    Demolition of buildings with 80 m² or more of floor area requires notification under Japan’s Construction Material Recycling Act at least seven days before work begins. We prepare the paperwork and visit neighbors with a letter explaining the schedule.

  6. 06

    Screening and hand sorting

    We erect scaffolding and mesh sheeting, then remove and separate interior materials, fixtures, glass and roof tiles by hand.

  7. 07

    Mechanical demolition and foundations

    We suppress dust with water while demolishing the building, then excavate and remove its foundations.

  8. 08

    Sorting and removal

    We separate timber, concrete rubble, scrap metal and plasterboard for removal. Manifests (Japan’s industrial-waste tracking documents) trace the waste to its final disposal site.

  9. 09

    Leveling and handover

    We level the ground and provide a completion report with photographs and documents needed to register the building’s removal from Japan’s property register.

WHY US

Why crews choose us

All 36 products are consumables we use on our own sites. Every product page explains where and how we use it.

Skilled crew
31staff
Demolition machines
24units
Dump trucks
18units