WORKS
About these projects
These examples cover different building uses and project sizes. To protect customer equipment information, we omit facility names and show only use, scale, scope and duration. Please contact us for details or experience with similar buildings.
12,000projects
Projects completed, approximately
186contracts
Current business inspection contracts
We have completed approximately 12,000 projects and currently hold 186 regular inspection contracts with business customers.


CASE
Automotive parts factory: power-system upgrade
Approx. 4,200 m² floor area / Full replacement of a 26-year-old cubicle (an enclosed high-voltage receiving and transformer unit)
Annual inspections identified deteriorating transformer insulation and delayed circuit-breaker operation. We proposed replacement over a three-year planning period. With production unable to stop, work was concentrated into three days during the Obon summer holiday. New panels were preassembled and energized for testing in our workshop, leaving removal, installation, connection and final testing on site. Total outage time was 19 hours, and normal production resumed on the first morning after the holiday.
Duration
Approx. 5 months including design and manufacture / 3 days on site
CASE
Warehouse: LED lighting and rewiring
Approx. 9,800 m² floor area / Replacement of 214 mercury lamps

We replaced high-bay mercury lamps with LED fittings. Rather than a one-for-one exchange, we measured illuminance against the rack layout, reducing fittings in aisles and increasing them at picking locations. The total fell from 214 to 178, with on-site measurements showing approximately 63% lower lighting electricity consumption. Aging lighting branch circuits were replaced at the same time.
Duration
Approx. 6 weeks, working in separate zones while the warehouse remained operational
CASE
Commercial building: feeders and communications
Six floors above ground / Complete refurbishment of an existing building
Duration
Approx. 4 months

Conversion from offices to a mix of restaurants and retail changed each floor's power requirements, so we replaced the feeders. Some as-built drawings were missing, requiring a site survey and circuit tracing first. We also renewed LAN wiring throughout the building, 14 security cameras and the emergency public-address system. Planning power and communications routes together allowed shared ceiling service routes and shortened the planned construction period.

CASE
Residential care home: complete electrical installation
Three-story reinforced-concrete building / Capacity of 80 residents
We handled all electrical installations for this new long-term care home from the working-drawing stage. Residents' safety shaped the plan: emergency and exit lighting, coordination with automatic fire alarms, nurse-call wiring and separation of circuits that must remain powered during an outage. We built an on-site mock-up with the design practice to check nighttime bedroom lighting before selecting fittings.
Duration
Approx. 11 months alongside the building works
CASE
Home: distribution board and EV charging socket
24-year-old, two-story timber home

The customer was purchasing an electric car. With no spare circuits and insufficient capacity in the existing board, we proposed a replacement and a review of the electricity contract's main-breaker capacity. Wiring followed the exterior wall to a weatherproof socket in the garage. We also investigated intermittent breaker trips and found several high-load appliances on the washroom circuit, so we added a dedicated circuit.
Duration
1 day, including distribution board replacement
RECORD
Projects by building use
Approx. 1,900projects
Factories
Approx. 780projects
Warehouses
Approx. 1,400projects
Shops
Approx. 1,100projects
Offices
Approx. 420projects
Healthcare
Approx. 260projects
Education
Approx. 540projects
Agriculture
Approx. 5,600projects
Homes
(Approximate cumulative figures from our founding in 1972 through August 2026, including refurbishment and minor repairs.)